Then if there is room in that box for another 2 pole breaker it will make a line tap easier. I assume the inverters are outside?
I was looking at aggregating SREC's and what I could find is for systems over 10KW in Maryland they are requiring a revenue grade meter installed which you will have to read once a month and report. The readings from the inverter are not accurate enough apparently. I do not have anything out there right at 10KW DC and have not called the aggregator to check the requirement and the specifics. This is something you would want to do before you make the last payment.
I was looking at aggregating SREC's and what I could find is for systems over 10KW in Maryland they are requiring a revenue grade meter installed which you will have to read once a month and report. The readings from the inverter are not accurate enough apparently. I do not have anything out there right at 10KW DC and have not called the aggregator to check the requirement and the specifics. This is something you would want to do before you make the last payment.