California sucks. The PUC naming is a misnomer. There's nothing "Public" about it. It's as corrupt as FIFA.
I'm currently at year 12 since my system was installed here in California. I'm under NEM1.0. (solar city system with 22 Kyocera 210w panels and a basic string inverter.)
So - I have 8 years left.
Question: If I slightly upgrade the existing system somehow and complete that permit by 3/30/23, will that reset the clock for another 20 years instead of 8?
If so, what's the least expensive upgrade? Add a single 360 watt panel and throw in optimizers?
I'm currently at year 12 since my system was installed here in California. I'm under NEM1.0. (solar city system with 22 Kyocera 210w panels and a basic string inverter.)
So - I have 8 years left.
Question: If I slightly upgrade the existing system somehow and complete that permit by 3/30/23, will that reset the clock for another 20 years instead of 8?
If so, what's the least expensive upgrade? Add a single 360 watt panel and throw in optimizers?