Hi,
I am installing an 18 kW ground mount system with a 400 foot DC run to the AC inverters at the house. I am wondering whether any rapid shut down requirements from NEC 2017 would apply to this set-up?
Many thanks for any advice.
Thomas
I am installing an 18 kW ground mount system with a 400 foot DC run to the AC inverters at the house. I am wondering whether any rapid shut down requirements from NEC 2017 would apply to this set-up?
Many thanks for any advice.
Thomas