I just got my system turned on 8/1/2015.. very excited to be generating electricity.. From what I understand I am still on the Domestic rate schedule from Southern California Edison (SCE). I'm considering going to one of the Time of Use plans.. particularly option 'A'.. but as we are heading into shorter days with increased cloud cover (hello El Nino?).. should I go ahead and change my schedule now, knowing my production will shrink even as my usage remains the same? OR.. does billing START on the date I got my Permission to Operate, and I'll settle up that bill in one year from that start date, rather than a fixed calendar date such as January 1st?
If it is a year from turn on, then I guess it doesn't matter when I switch rate schedules?
Any advice from somebody who went through this already and can help me pull the trigger on that? I use a lot of power.. a family of 4, with a pool.. and in a home that is All-Electric, as propane/natural gas was never run to our neighborhood... I seem to be using about 1,700 kWh a month (will go down once pool needs less filtering).. my system is a 11kW system, though I'll likely never get to that number..
Thanks in advance!
If it is a year from turn on, then I guess it doesn't matter when I switch rate schedules?
Any advice from somebody who went through this already and can help me pull the trigger on that? I use a lot of power.. a family of 4, with a pool.. and in a home that is All-Electric, as propane/natural gas was never run to our neighborhood... I seem to be using about 1,700 kWh a month (will go down once pool needs less filtering).. my system is a 11kW system, though I'll likely never get to that number..
Thanks in advance!
Comment