Puting this up to see if anyone else out there is going through what I am with regards to their solar installations. I had my panels put up around the end of February this year. It took about a week to get them installed, panel derated, etc. Took about another month to get permits with the city pulled and inspected. Everything passed.
Now the Los Angeles department of water and power wants its own electrical panel permits pulled even though I have an electrical permit for the system signed off on already by the City. I have no idea how long this will take, and what other steps I'll have to go through to get my system up and running. At the rate this is going summer will be over long after I finally can switch the system on.
Has anyone else had these issues? My installer says this is highly unusual but there's nothing out of the ordinary about my system.
Any feedback would be appreciated.
Now the Los Angeles department of water and power wants its own electrical panel permits pulled even though I have an electrical permit for the system signed off on already by the City. I have no idea how long this will take, and what other steps I'll have to go through to get my system up and running. At the rate this is going summer will be over long after I finally can switch the system on.
Has anyone else had these issues? My installer says this is highly unusual but there's nothing out of the ordinary about my system.
Any feedback would be appreciated.
Comment