    Originally posted by NESTCAFE
    What I don't understand is the basic technique of project management, over communication, and advanced scheduling. I understand the stereotypical situation of project delay by contractors. I informed the rep that I am ok with project delay but I am not ok without any installation timeline. All I got is "This is a seven week installation process.." And this company doesn't seem to "transfer" the project to delivery team after signing contract. There is no clear communication as to which project manager is, PM's contact info, when next step is. Without advanced scheduling, should I just need to reserve $20 to $30K around for them to pick up at any time they want?

    As of today, it is about 12 business days into signing the contract. Deposit check was cleared by bank 5 days after signing the contract. I had to send a few emails to request the first whatever step. SCE bills was requested 10 days after signing the contract to start net meeting application. And I have not seen my design proposal. No engineer actually came to do site survey yet. Of course, I have no idea what they will like to perform next.

    I don't think it's fair to blame on the sales rep unless he is the owner/management or project lead. Honestly, canceling the contract is still in my mind.
    That doesn't sound good. When I used them in April, there were some delays but they eventually pulled through. The sales/project manager is sometimes out of step with the rest of the crew in terms of timing; add to that the busy summer months and delays are the result.

    Hopefully, they'll start on your system soon!

    Comment

    • s_man
      Member
      • Apr 2015
      • 99

      #107
      Originally posted by NESTCAFE
      What I don't understand is the basic technique of project management, over communication, and advanced scheduling. I understand the stereotypical situation of project delay by contractors. I informed the rep that I am ok with project delay but I am not ok without any installation timeline. All I got is "This is a seven week installation process.." And this company doesn't seem to "transfer" the project to delivery team after signing contract. There is no clear communication as to which project manager is, PM's contact info, when next step is. Without advanced scheduling, should I just need to reserve $20 to $30K around for them to pick up at any time they want?

      As of today, it is about 12 business days into signing the contract. Deposit check was cleared by bank 5 days after signing the contract. I had to send a few emails to request the first whatever step. SCE bills was requested 10 days after signing the contract to start net meeting application. And I have not seen my design proposal. No engineer actually came to do site survey yet. Of course, I have no idea what they will like to perform next.

      I don't think it's fair to blame on the sales rep unless he is the owner/management or project lead. Honestly, canceling the contract is still in my mind.
      Yeah, I agree company B needs better project management. That was my concern too. I will let David know about your issue as well.

      Comment

      • s_man
        Member
        • Apr 2015
        • 99

        #108
        Another step closer

        They came last Thursday and Friday to install the optimizers, the inverter and the electric panel. They still haven't finished it yet but look like a nice clean job so far and I am happy feeling getting closer . Here are the pictures:
        Attached Files

        Comment

        • s_man
          Member
          • Apr 2015
          • 99

          #109
          Rough Inspection

          Some updates. Today, a city inspector and his assistant came out to do a rough inspection before solar panels could be installed. They did climb up to the roof and found only a few minor corrections otherwise everything else is good. It turns out the city does not allow a solar panel to be on top of the flat vent they converted from my half dome vent so the contractor will have to put that panel in another spot. The inspector also noticed plastic zip ties were used to fasten the conduit to the racking's rail so they noted it down that we needs to use stainless steel zip tie when we need to fasten the PV wires to the racking or just put the wires running inside the rail if they are fit; reason: the plastic ties wouldn't last that long on the roof.

          Comment

          • J.P.M.
            Solar Fanatic
            • Aug 2013
            • 15015

            #110
            Originally posted by s_man
            Some updates. Today, a city inspector and his assistant came out to do a rough inspection before solar panels could be installed. They did climb up to the roof and found only a few minor corrections otherwise everything else is good. It turns out the city does not allow a solar panel to be on top of the flat vent they converted from my half dome vent so the contractor will have to put that panel in another spot. The inspector also noticed plastic zip ties were used to fasten the conduit to the racking's rail so they noted it down that we needs to use stainless steel zip tie when we need to fasten the PV wires to the racking or just put the wires running inside the rail if they are fit; reason: the plastic ties wouldn't last that long on the roof.
            It is common for building codes to disallow vents to be obstructed. It's probably easier to move the panel, but if space is at a premium, an alternative to moving the panel is moving the vent.

            Comment

            • Bynumite
              Junior Member
              • Aug 2015
              • 7

              #111
              Originally posted by s_man
              P.M. sent
              Hey man. I am not at the 10 post limit but would appreciate it if you could PM referrals of companies B and C. The companies I have been talking to have only been giving me that quote for SW panels and not the LG panels.

              Comment

              • s_man
                Member
                • Apr 2015
                • 99

                #112
                Originally posted by Bynumite
                Hey man. I am not at the 10 post limit but would appreciate it if you could PM referrals of companies B and C. The companies I have been talking to have only been giving me that quote for SW panels and not the LG panels.
                P.m. sent.

                Comment

                • Kbbean
                  Junior Member
                  • Aug 2015
                  • 18

                  #113
                  Originally posted by s_man
                  P.m. sent.
                  Can you also PM me company b and c. Thank you.

                  Comment

                  • s_man
                    Member
                    • Apr 2015
                    • 99

                    #114
                    Originally posted by Kbbean
                    Can you also PM me company b and c. Thank you.
                    P.M. sent

                    Comment

                    • Bynumite
                      Junior Member
                      • Aug 2015
                      • 7

                      #115
                      Originally posted by s_man
                      P.m. sent.
                      Thank you for your help man. This is amazing!!!!

                      I actually talked to company C before and they gave me a 3.4 $/kwh with Solarworld panels for a 6kwh system. You think its worth it to go for LG instead?

                      Comment

                      • s_man
                        Member
                        • Apr 2015
                        • 99

                        #116
                        Originally posted by Bynumite
                        Thank you for your help man. This is amazing!!!!

                        I actually talked to company C before and they gave me a 3.4 $/kwh with Solarworld panels for a 6kwh system. You think its worth it to go for LG instead?
                        Company C gave me $3.5 then I told them Gvl got $3.17 then they lower it down to $3.27. If you get Solarworld the price should even be lower. LG is a much bigger company than Solarworld so probably will stay around longer

                        Comment

                        • Bynumite
                          Junior Member
                          • Aug 2015
                          • 7

                          #117
                          Originally posted by s_man
                          Company C gave me $3.5 then I told them Gvl got $3.17 then they lower it down to $3.27. If you get Solarworld the price should even be lower. LG is a much bigger company than Solarworld so probably will stay around longer
                          Hmm and that price of 3.27 includes the price for an upgrade to a 220v breaker right?

                          Comment

                          • bmarler
                            Junior Member
                            • Aug 2015
                            • 22

                            #118
                            Originally posted by s_man
                            P.M. sent
                            Can you please PM me Company B & C as well. Thank you.

                            Comment

                            • s_man
                              Member
                              • Apr 2015
                              • 99

                              #119
                              Originally posted by Bynumite
                              Hmm and that price of 3.27 includes the price for an upgrade to a 220v breaker right?
                              No, panel upgrade was extra $1500 for company B and $1800 for company C.

                              Comment

                              • s_man
                                Member
                                • Apr 2015
                                • 99

                                #120
                                Originally posted by bmarler
                                Can you please PM me Company B & C as well. Thank you.
                                P.M. sent.

                                Comment