I would question whether this is true. Reason being, I have gotten a very good glimpse of my town's politics, including the code officials and inspectors used. There is a wide spectrum of expertise, from excellent to very poor.
I wired my entire house, as a novice who checked a copy of the NEC out of the library, and asked some questions at the elec supply house. The inspection was done by the town zoning officer, and he walked through and looked to see all the outlets were covered. Then he approved my work, after like 5 minutes. That was 20 years ago, and yes we have come up a few notches. Perhaps there are more comprehensive requirements for PV system inspections, where things like that can't happen.
I wired my entire house, as a novice who checked a copy of the NEC out of the library, and asked some questions at the elec supply house. The inspection was done by the town zoning officer, and he walked through and looked to see all the outlets were covered. Then he approved my work, after like 5 minutes. That was 20 years ago, and yes we have come up a few notches. Perhaps there are more comprehensive requirements for PV system inspections, where things like that can't happen.
Comment