  • esquivelso
    replied
    Originally posted by subdriver97
    I got approval the day after the final inspection by the City

    Timeline from contract to finish
    12/17 contract signed with solar installer ($1,000 downpayment)
    1/6 permit submitted
    1/27 - 1/29 re-roof & pv solar installation ($6,930 to roofing company)
    3/2 SDGE service disconnect & service panel upgrade ($3,500 paid for design & permit)
    3/4 & 3/6 stucco repair
    3/9 City Final Inspection ($9,483.00 paid for 80%)
    3/10 SDGE Authority to Operate granted
    Hi subdriver,

    Very new to this site and very new to the possiblity of going solar. Just recently got an EV lease so I think it's finally time to make the jump! I'm in San Marcos - any chance you, or anyone else, could PM me the name of the installer you used? Thanks so much!

    Sergio

    Leave a comment:


  • thejq
    replied
    Originally posted by subdriver97
    I got approval the day after the final inspection by the City

    Timeline from contract to finish
    12/17 contract signed with solar installer ($1,000 downpayment)
    1/6 permit submitted
    1/27 - 1/29 re-roof & pv solar installation ($6,930 to roofing company)
    3/2 SDGE service disconnect & service panel upgrade ($3,500 paid for design & permit)
    3/4 & 3/6 stucco repair
    3/9 City Final Inspection ($9,483.00 paid for 80%)
    3/10 SDGE Authority to Operate granted
    Excellent. Ask your installer to enable your SolarEdge public site so you can share with the rest of us.

    Leave a comment:


  • lkstaack
    replied
    Originally posted by subdriver97
    I got approval the day after the final inspection by the City

    Timeline from contract to finish
    12/17 contract signed with solar installer ($1,000 downpayment)
    1/6 permit submitted
    1/27 - 1/29 re-roof & pv solar installation ($6,930 to roofing company)
    3/2 SDGE service disconnect & service panel upgrade ($3,500 paid for design & permit)
    3/4 & 3/6 stucco repair
    3/9 City Final Inspection ($9,483.00 paid for 80%)
    3/10 SDGE Authority to Operate granted
    Installer got right on it. It's going to be almost 90 days for me from contract to PV install. I'm hoping for a 30 MAR start date.

    Leave a comment:


  • bcroe
    replied
    Originally posted by subdriver97
    I got finally approval from SDGE to connect to the grid HOORAY!!! I turned it on at 4pm and got a tiny bit of production before the sun went down.

    As promised, SDGE did the power disconnect last monday 3/2 and my service panel was upgraded to a 125A panel to accommodate the 40A breaker for the solar system. (I did just notice that my neighbor two houses over does not have a service panel upgrade and is running a 20A breaker on 18 panels, I only have 15 panels. I'll have to ask him about his system specs. I'm willing to bet he leased the system and the installer went cheap... but my installer insisted that I wouldn't be able to use a smaller breaker... )

    [ATTACH=CONFIG]6029[/ATTACH]

    Not much, but a start!
    Frame that one and keep them coming. Bruce Roe

    Leave a comment:


  • subdriver97
    replied
    Originally posted by lkstaack
    How long did it take to get approval?
    I got approval the day after the final inspection by the City

    Timeline from contract to finish
    12/17 contract signed with solar installer ($1,000 downpayment)
    1/6 permit submitted
    1/27 - 1/29 re-roof & pv solar installation ($6,930 to roofing company)
    3/2 SDGE service disconnect & service panel upgrade ($3,500 paid for design & permit)
    3/4 & 3/6 stucco repair
    3/9 City Final Inspection ($9,483.00 paid for 80%)
    3/10 SDGE Authority to Operate granted

    Leave a comment:


  • Alisobob
    replied
    Originally posted by subdriver97

    [ATTACH=CONFIG]6029[/ATTACH]

    Not much, but a start!
    i_love_solar_power_heart_custom_personalized_sticker-r00c3c178ad7344fca8015c4e64ef80fd_v9wth_8by.jpg

    Woo Hoo!!!

    Leave a comment:


  • lkstaack
    replied
    Originally posted by subdriver97
    I got finally approval from SDGE to connect to the grid HOORAY!!! I turned it on at 4pm and got a tiny bit of production before the sun went down.

    As promised, SDGE did the power disconnect last monday 3/2 and my service panel was upgraded to a 125A panel to accommodate the 40A breaker for the solar system. (I did just notice that my neighbor two houses over does not have a service panel upgrade and is running a 20A breaker on 18 panels, I only have 15 panels. I'll have to ask him about his system specs. I'm willing to bet he leased the system and the installer went cheap... but my installer insisted that I wouldn't be able to use a smaller breaker... )

    [ATTACH=CONFIG]6029[/ATTACH]

    Not much, but a start!
    How long did it take to get approval?

    Leave a comment:


  • subdriver97
    replied
    I got finally approval from SDGE to connect to the grid HOORAY!!! I turned it on at 4pm and got a tiny bit of production before the sun went down.

    As promised, SDGE did the power disconnect last monday 3/2 and my service panel was upgraded to a 125A panel to accommodate the 40A breaker for the solar system. (I did just notice that my neighbor two houses over does not have a service panel upgrade and is running a 20A breaker on 18 panels, I only have 15 panels. I'll have to ask him about his system specs. I'm willing to bet he leased the system and the installer went cheap... but my installer insisted that I wouldn't be able to use a smaller breaker... )

    Screen Shot 2015-03-10 at 8.39.27 PM.png

    Not much, but a start!

    Leave a comment:


  • subdriver97
    replied
    Originally posted by carona
    I was hoping for the name of your installer also. I'm getting quotes in the Temecula area, and I'm getting quotes in the low $4 range. Appreciate the help. PM me when convenient.
    PM Sent.

    Leave a comment:


  • DanKegel
    replied
    Looks very nice.

    What's the distance from the ridge to the top of the array?

    Leave a comment:


  • carona
    replied
    Originally posted by subdriver97
    PM Sent

    I was hoping for the name of your installer also. I'm getting quotes in the Temecula area, and I'm getting quotes in the low $4 range. Appreciate the help. PM me when convenient.

    Leave a comment:


  • ericf1
    replied
    Looking good. My first appt was mid March (a 6 week backlog), but my installer got in on a cancelled appointment for the service upgrade, so I only waited 3 days. I got lucky I guess.

    Leave a comment:


  • subdriver97
    replied
    Install Day 3

    IMG_5189.jpgIMG_5190.jpg

    I'm now waiting for my SDGE appointment on March 2 to perform the service panel upgrade. Once that done... inspection and connect to the grid!