Installation is in progress! Ironridge XR100 racking on Ironridge Flashfoot footings is almost up. Solaredge SE7600 is mounted.
Major components of this installation are:
Ironridge XR100 Racking
SolarEdge se7600a-us002nnu2 Inverter
24 SolarEdge P300 Power Optimizers
24 LG300N1C-B3 Panels
IMG_0628 (1).JPG
Each string will be a separate array of 12 panels, 3 high x 4 wide.
IMG_0623.JPG
Racking almost complete
IMG_0626.JPG
Facing due south, no shading issues.
Net metering request has been submitted and final inspection is expected tomorrow or Monday, depending on SDG&E and the city.
Major components of this installation are:
Ironridge XR100 Racking
SolarEdge se7600a-us002nnu2 Inverter
24 SolarEdge P300 Power Optimizers
24 LG300N1C-B3 Panels
IMG_0628 (1).JPG
Each string will be a separate array of 12 panels, 3 high x 4 wide.
IMG_0623.JPG
Racking almost complete
IMG_0626.JPG
Facing due south, no shading issues.
Net metering request has been submitted and final inspection is expected tomorrow or Monday, depending on SDG&E and the city.

Comment