Power management problem
Using a transfer switch twice a day sounds difficult. Can this be done without
batteries, or at least with very few batteries? Is it all automatic, equipment for
this sort of service available? Inverters on all the time waste a lot.
Its a huge power management problem. Without a grid tie, a LOT of PV energy
may not get utilized when available. I am imagining your whole load system
being designed around the time of day. Perhaps the primary problem is getting
through each night; here its a matter of getting through winter. Bruce Roe
Originally posted by boostinsteve
batteries, or at least with very few batteries? Is it all automatic, equipment for
this sort of service available? Inverters on all the time waste a lot.
Its a huge power management problem. Without a grid tie, a LOT of PV energy
may not get utilized when available. I am imagining your whole load system
being designed around the time of day. Perhaps the primary problem is getting
through each night; here its a matter of getting through winter. Bruce Roe
Comment