That depends on how you interpret the slightly contradictory parts of the new code section.
The first part describes a maximum voltage conductor to conductor or conductor to ground applying to each individual module output.
The second part categorically exempts all wires which do not extend more than 10 feet from the array or more than 5 feet into the building, whichever is smaller.
The common interpretation (as far as any AHJs have said anything at all
) is that the second section exempts or limits the application of the more strictly worded provisions of the first section.
You will see that point of view represented clearly over at Mike Holt.
But that is no guarantee that some AHJ will not have a different interpretation.
My personal analysis (without access to the guy who actually wrote the new text) is that in a later code cycle the exception will be removed, leaving the stricter first part in effect without having to change the wording of that part.
I agree that if the overriding concern is firefighter safety, sparing no expense, you should put in module level disconnects or module level shorting relays whether the code requires it or not.
The application to commercial/industrial scale arrays on roofs will be truly entertaining.
The first part describes a maximum voltage conductor to conductor or conductor to ground applying to each individual module output.
The second part categorically exempts all wires which do not extend more than 10 feet from the array or more than 5 feet into the building, whichever is smaller.
The common interpretation (as far as any AHJs have said anything at all

You will see that point of view represented clearly over at Mike Holt.
But that is no guarantee that some AHJ will not have a different interpretation.
My personal analysis (without access to the guy who actually wrote the new text) is that in a later code cycle the exception will be removed, leaving the stricter first part in effect without having to change the wording of that part.
I agree that if the overriding concern is firefighter safety, sparing no expense, you should put in module level disconnects or module level shorting relays whether the code requires it or not.
The application to commercial/industrial scale arrays on roofs will be truly entertaining.

Comment