Seems local FD are fed up with PV systems. A new code requirement can virtually stop all new installations or make them extremely expensive. Makes no difference is grid tied or stand alone.
690.12 PV Arrays on Buildings Response to Emergency
Shutdown. . For PV Systems installed on roofs of buildings,
photovoltaic source circuits shall be deenergized from
all sources within 10 seconds of when emergency shutdown
is initiated or when the PV power source disconnecting
means is opened. When the source circuits are deenergized,
the maximum voltage at the module and module conductors
shall be 80 volts or less.
It is going to be real interesting to see how installers comply with the new rules. Should slam the breaks on all new installs.
690.12 PV Arrays on Buildings Response to Emergency
Shutdown. . For PV Systems installed on roofs of buildings,
photovoltaic source circuits shall be deenergized from
all sources within 10 seconds of when emergency shutdown
is initiated or when the PV power source disconnecting
means is opened. When the source circuits are deenergized,
the maximum voltage at the module and module conductors
shall be 80 volts or less.
It is going to be real interesting to see how installers comply with the new rules. Should slam the breaks on all new installs.