One issue I see is that all electricians do not have the same experience and understanding of the entire NEC.
Electricians in each area; Utility, Industrial, Commercial and Residential, while they follow the Code in general also focus on specific areas based on their job requirements.
I would hope that the Inspector of a Solar PV system installation not only had experience but also a complete understanding of that part of the NEC code.
I have worked in the industrial area for more than 35 years and I can tell you when I interviewed a candidates for an electricians positions, and they only had residential experience I found a severe lack of 3 phase 480volt voltage understanding. On the flip side if someone in the Utility area has always been working on 13.8kv over head systems, they may have a lack of knowledge at the 120/240volt area and Solar PV installations in particular.
While the requirement of inspection may not need to be written in the NEC there needs to be a clear understanding that any inspection and approval should be performed by someone that has both experience and a solid understanding of both Local and National codes with respect to the type of installation performed.
Electricians in each area; Utility, Industrial, Commercial and Residential, while they follow the Code in general also focus on specific areas based on their job requirements.
I would hope that the Inspector of a Solar PV system installation not only had experience but also a complete understanding of that part of the NEC code.
I have worked in the industrial area for more than 35 years and I can tell you when I interviewed a candidates for an electricians positions, and they only had residential experience I found a severe lack of 3 phase 480volt voltage understanding. On the flip side if someone in the Utility area has always been working on 13.8kv over head systems, they may have a lack of knowledge at the 120/240volt area and Solar PV installations in particular.
While the requirement of inspection may not need to be written in the NEC there needs to be a clear understanding that any inspection and approval should be performed by someone that has both experience and a solid understanding of both Local and National codes with respect to the type of installation performed.