Hello folks,
Reaching out to this group to see if there’ an alternative to legal recourse.
We’ve had a grid-tied solar setup with an LG RESU 10H battery/SolarEdge StorEdge 7600 inverter since 2018. The experience was good enough for us to add a few more panels and a second LG RESU 10H battery in late 2019. I won’t bore you with the months long installation issues we had this go around, but suffice to say, after a lot of issues and back and forth, the setup was up and running perfectly since mid 2020.
Come May of last year, we got a notification about a recall on ONE of the two batteries. Initially, the battery replacement was supposed to happen some time in Q3. Until then, they pushed out an update that capped BOTH our batteries to 75% capacity for safety reasons. Q3 came and went, the new battery replacement timeframe became Q4. That became Q1’22 and now we’re in April, almost a year since they gimped the batteries.
Our installers, LA Solar, was been essentially useless. They just keep telling me that LG keeps pushing the date out, and LG themselves have been utterly useless. Any one else in the same situation? if so, what did you do to get this resolved? If not, what to folks suggest as next steps? With summer just around the corner, quite frustrated that the really expensive setup we’ve paid for is essentially running gimped.
Appreciate any help/feedback!
Cheers
Reaching out to this group to see if there’ an alternative to legal recourse.
We’ve had a grid-tied solar setup with an LG RESU 10H battery/SolarEdge StorEdge 7600 inverter since 2018. The experience was good enough for us to add a few more panels and a second LG RESU 10H battery in late 2019. I won’t bore you with the months long installation issues we had this go around, but suffice to say, after a lot of issues and back and forth, the setup was up and running perfectly since mid 2020.
Come May of last year, we got a notification about a recall on ONE of the two batteries. Initially, the battery replacement was supposed to happen some time in Q3. Until then, they pushed out an update that capped BOTH our batteries to 75% capacity for safety reasons. Q3 came and went, the new battery replacement timeframe became Q4. That became Q1’22 and now we’re in April, almost a year since they gimped the batteries.
Our installers, LA Solar, was been essentially useless. They just keep telling me that LG keeps pushing the date out, and LG themselves have been utterly useless. Any one else in the same situation? if so, what did you do to get this resolved? If not, what to folks suggest as next steps? With summer just around the corner, quite frustrated that the really expensive setup we’ve paid for is essentially running gimped.
Appreciate any help/feedback!
Cheers
Comment