Have a quad stack SI 6048 US (1 Master + 3 slaves) AC + PV coupled system. I want to be able to program the Master to go into battery mode every day from 12AM to 9AM as I have enough battery storage to run the house without grid supply power. Can anybody tell me if I can use parameters 500# 500.04 InvTmOpStrTm – 500.05 InvTmOpRnTm – 500.06 InvTmOpCyc OR TmCtl.IsOn - TmCtl.RptCyc - TmCtl.StrTm to accomplish this task? Or if I need to install a contactor to disconnect from grid and use Relay 1 or 2 to control the solenoid.
SMA SI 6048 US - Time controlled operation
Collapse
X
-
-
You should really call the SMA Tech Support for this. The Island can be hard to setup with multiple parameters involved spread around the different menus.BSEE, R11, NABCEP, Chevy BoltEV, >3000kW installed -