[QUOTE=sensij;n324966]Please take a picture of how the final wiring is connected at the inverter. If the inverter has several mppt's, but you have just one combined home run, you need to make sure only one mppt is active.
Good idea, I will take a picture and post. I am not sure but if the dc control board combines at the inverter would it be default one MPPT? When only one terminal (dc) is connected the 4 terminal
are live so I thought this to be a load or input sharing strategy but just assumption on my part.
Good idea, I will take a picture and post. I am not sure but if the dc control board combines at the inverter would it be default one MPPT? When only one terminal (dc) is connected the 4 terminal
are live so I thought this to be a load or input sharing strategy but just assumption on my part.
Comment