I am trying to develop a 400 KW Solar Power Project on a Commercial Building on a cost plus basis. The installation will be non-penetrating on the flat roof of the building. Can anybody indicate the type of labor, skillsets and effort involved strictly from a Labor costing perspective. I expect the installation of the inverter, wiring and certification would be part of this process.
thanks
thanks
Comment