Hello,
I've just finished building my PV system, which consists of 21 Suniva 260W panels, 21 SolarEdge 300W Optimizers and a SolarEdge SE5000A-US inverter. And of course the state/city required disconnects and breakers. Everything is entirely up to code.
I've just missed the cutoff for the city and Southern California Edison to inspect before the new year. Edison has not yet replaced my meter and has not given the approval to connect. So, my question is this; It's a grid tired inverter, I need to connect it to power it up and verify that all the optimizers are functional and that the inverter is fully operational. Do I have to wait a month for Edison to inspect, or can I bring it online and get everything configured and tested before then? Also, without the meter being replaced, can they even tell if it was producing before they inspect?
Thanks in advance.
Dave
I've just finished building my PV system, which consists of 21 Suniva 260W panels, 21 SolarEdge 300W Optimizers and a SolarEdge SE5000A-US inverter. And of course the state/city required disconnects and breakers. Everything is entirely up to code.
I've just missed the cutoff for the city and Southern California Edison to inspect before the new year. Edison has not yet replaced my meter and has not given the approval to connect. So, my question is this; It's a grid tired inverter, I need to connect it to power it up and verify that all the optimizers are functional and that the inverter is fully operational. Do I have to wait a month for Edison to inspect, or can I bring it online and get everything configured and tested before then? Also, without the meter being replaced, can they even tell if it was producing before they inspect?
Thanks in advance.
Dave