Hi All,
We run into a situation that we are feeding 2 inverters to single meter. 2 separate breakers and AC disconnect (Safety Switch) . Utility inspector required single point of isolation and now we have to find a most cost effective way to combine them. Any smart ideas?????
We run into a situation that we are feeding 2 inverters to single meter. 2 separate breakers and AC disconnect (Safety Switch) . Utility inspector required single point of isolation and now we have to find a most cost effective way to combine them. Any smart ideas?????