This will be an easy one for you guys, I've been reading and kinda going in circles.
Pertaining to EGC from the panels to the GTI, my installation is as follows:
10KW array --> #12 run via FMC inside home --> to GTI --> #6 run via conduit to 200A subpanel (#10 EGC for this run)
Now, i get the bare #6 on the roof for bonding, but some are saying never run the EGC inside the house raceway. so is it like this:
#6 bonding--> #6 outside of house to ground rod --> back up to GTI and then to subpanel?
Trying to wrap my head around the EGC for the panels so I can order the cable.
Pertaining to EGC from the panels to the GTI, my installation is as follows:
10KW array --> #12 run via FMC inside home --> to GTI --> #6 run via conduit to 200A subpanel (#10 EGC for this run)
Now, i get the bare #6 on the roof for bonding, but some are saying never run the EGC inside the house raceway. so is it like this:
#6 bonding--> #6 outside of house to ground rod --> back up to GTI and then to subpanel?
Trying to wrap my head around the EGC for the panels so I can order the cable.
Comment