Finishing up writing everything up- Does this sound like it's correct-
4 Arrays 400 watt panels a piece (48) total
48 P400 optimizers
4 Arrays- 2 arrays per 7600 inverter
Both Inverters going to 100amp breaker panel w/ 2 40amp breakers a piece
Breaker box going to AC Disconnect
AC disconnect going to B taps on Bidirectional meter- (over the 120% rule on 200MSP)
Thanks in advance-