Could someone tell me what might be reasonable labor cost, assuming all the correct parts are available, to install the mounting racks, hook up the optimizers, and connect to inverter (or junction box on roof).
Assumptions are:
Near Palm Desert, CA (think outside San Diego)
Existing solar inverter is already checked to make sure the inverter can handle the 5 new panels
Flat roof with easy access (no ladders needed)
Electrical Panel already check to be able to handle the extra solar load
Need to add new stantions on flat roof for flat to roof install
No extra permits needed
Just throw out some wild guesses please.
Assumptions are:
Near Palm Desert, CA (think outside San Diego)
Existing solar inverter is already checked to make sure the inverter can handle the 5 new panels
Flat roof with easy access (no ladders needed)
Electrical Panel already check to be able to handle the extra solar load
Need to add new stantions on flat roof for flat to roof install
No extra permits needed
Just throw out some wild guesses please.
Comment