I am installing three strings on my barn roof, which will be feeding 2 inverters in my house which is about 150' away. The run from barn to house is buried PVC40 conduit. Two of these strings will be combined to feed one inverter, though in the future I may want to separate them (different inverter with more MPPT). Originally the plan was for a combiner in the barn (for the two strings) and THHN from the combiner to the inverter. If I eliminate the combiner box in the barn, I can run each string straight to the DC disconnect at the inverter. The disconnect can accommodate 2 strings. I assume PV wire should be used all the way?