Good afternoon (ladies and?) gentlemen...
I'm a DIY'er and I'm about to pull my permit for a solar install + panel upgrade. Here are the details on my system:
*25 Astronergy 255 watt panels with enphase 215 microinverters
*enphase cables and Iron Ridge XRL rails
*Two 20 AMP AC branch circuits, 10 and 15 panels respectively due to geometries involved)
*Brand new main service panel (200 amp siemens service panel with built in meter socket) in a different location from the old one. The Southern California Edison rep has already come out and marked my new meter location.
*I have submitted my interconnection agreement with line diagram to SCE as well, and have supplied one round of corrections and expect approval any time.
I've done umpteen hours of research and reading but I have a few questions that aren't readily obvious to me thus far.
1. I know I need to have two 8 foot grounding rods at least 6 feet apart... but can I use any existing grounding rod as one of those two, assuming I bond them continuously?
2. I read something about how the equipment grounding wire needs to run in the same conduit as the system wiring when leaving the site of the PV array. So I'll have two branch circuits in insulated 12 AWG and one 6 AWG bare copper wire in my conduit. Does that sound right?
3. SCE does not require a separate disconnect or performance meter, but the sample line diagram does include a solar sub panel. From what I read, I can run my two AC branch circuits directly to the main service panel so there's no reason for a sub panel. Am I wrong?
4. Do the two 20 AMP solar breakers need to be backfed breakers?
5. For normal branch circuits (not the solar ones) requiring GFCI protection, a single GFCI outlet on that circuit is enough right? Or do I need a GFCI breaker on that circuit?
6. I plan on having my enphase cables run into weatherproof J-boxes, then through normal 12 AWG insulated wire to the main service panel. I'll have two circuits (and the EGC 6 AWG bare wire?) running through the same conduit. Conduit and junction boxes will be mounted atop 4x4 treated wood blocks with metal brackets to hold the conduit to the block. So the conduits will be about 4" off the flat composition surface. My wire sizes are good according to the length and temp tables. Any tips/advice for the type of conduit or how I install it?
7. What would be the best way to run all my old wiring over the 30 feet from my old panel location to my new panel location? Would it be worth digging into my walls/roof to run them inside, or can I just run a big conduit / raceway over the roof?
8. Anything else that pops into your mind looking at my plan?
Thanks for reading this far!
I've attached a photo of my old panel for you for comic relief and to marvel at how my house hasn't burned down yet.
Eric
Camarillo, CA

I'm a DIY'er and I'm about to pull my permit for a solar install + panel upgrade. Here are the details on my system:
*25 Astronergy 255 watt panels with enphase 215 microinverters
*enphase cables and Iron Ridge XRL rails
*Two 20 AMP AC branch circuits, 10 and 15 panels respectively due to geometries involved)
*Brand new main service panel (200 amp siemens service panel with built in meter socket) in a different location from the old one. The Southern California Edison rep has already come out and marked my new meter location.
*I have submitted my interconnection agreement with line diagram to SCE as well, and have supplied one round of corrections and expect approval any time.
I've done umpteen hours of research and reading but I have a few questions that aren't readily obvious to me thus far.
1. I know I need to have two 8 foot grounding rods at least 6 feet apart... but can I use any existing grounding rod as one of those two, assuming I bond them continuously?
2. I read something about how the equipment grounding wire needs to run in the same conduit as the system wiring when leaving the site of the PV array. So I'll have two branch circuits in insulated 12 AWG and one 6 AWG bare copper wire in my conduit. Does that sound right?
3. SCE does not require a separate disconnect or performance meter, but the sample line diagram does include a solar sub panel. From what I read, I can run my two AC branch circuits directly to the main service panel so there's no reason for a sub panel. Am I wrong?
4. Do the two 20 AMP solar breakers need to be backfed breakers?
5. For normal branch circuits (not the solar ones) requiring GFCI protection, a single GFCI outlet on that circuit is enough right? Or do I need a GFCI breaker on that circuit?
6. I plan on having my enphase cables run into weatherproof J-boxes, then through normal 12 AWG insulated wire to the main service panel. I'll have two circuits (and the EGC 6 AWG bare wire?) running through the same conduit. Conduit and junction boxes will be mounted atop 4x4 treated wood blocks with metal brackets to hold the conduit to the block. So the conduits will be about 4" off the flat composition surface. My wire sizes are good according to the length and temp tables. Any tips/advice for the type of conduit or how I install it?
7. What would be the best way to run all my old wiring over the 30 feet from my old panel location to my new panel location? Would it be worth digging into my walls/roof to run them inside, or can I just run a big conduit / raceway over the roof?
8. Anything else that pops into your mind looking at my plan?
Thanks for reading this far!
I've attached a photo of my old panel for you for comic relief and to marvel at how my house hasn't burned down yet.
Eric
Camarillo, CA