I will be installing a Lorentz P600cs-15-1 ( formally: PS600 Badu Top 12 ) to filter my swimming pool in Spain. Today I have bought: panels of
2 x 220w 29.5v.
1 x 230w 29.5v
And one that I could not refuse at the price: 1 x 190w 36.6v.
Here is some info on the pump controller:
Max power Input ( Vmp ) min 68.
Open Circuit ( Voc ) max 150.
Nominal Voltage ( Vdc ) 48-72.
Here's the questions:
How do I wire the things?
Can it be possible to include the 36.6v panel in the set up along with the 29.9v panels, or do I stick a for sale sale sign on it?
Would it be possible to run this pump with just three panels?
Any help would be a big help.
Oh I am OK with pipes.
2 x 220w 29.5v.
1 x 230w 29.5v
And one that I could not refuse at the price: 1 x 190w 36.6v.
Here is some info on the pump controller:
Max power Input ( Vmp ) min 68.
Open Circuit ( Voc ) max 150.
Nominal Voltage ( Vdc ) 48-72.
Here's the questions:
How do I wire the things?
Can it be possible to include the 36.6v panel in the set up along with the 29.9v panels, or do I stick a for sale sale sign on it?
Would it be possible to run this pump with just three panels?
Any help would be a big help.
Oh I am OK with pipes.
Comment