Hello
I have developed a Solar powered 3-Phase Inverter, and it is working fine.
it is basically an MPPT based VFD to alter motor frequency based on an MPPT point.
I want to introduce a Dry running mechanism now.
What i did till now...
I measured a current say Imotor. From this value i determine Idry
Idry = Istart/2 (factor is determined by actually measuring both currents)
Wait for some time and measure Imotor, if it is below Idry, confirm dry running state and shut down motor.
But the problem is that whenever Sunlight is low, Imotor is anyways low and false dry run current is recorded.
How is this done?
Can someone share some thought?
Thanks and regards
I have developed a Solar powered 3-Phase Inverter, and it is working fine.
it is basically an MPPT based VFD to alter motor frequency based on an MPPT point.
I want to introduce a Dry running mechanism now.
What i did till now...
I measured a current say Imotor. From this value i determine Idry
Idry = Istart/2 (factor is determined by actually measuring both currents)
Wait for some time and measure Imotor, if it is below Idry, confirm dry running state and shut down motor.
But the problem is that whenever Sunlight is low, Imotor is anyways low and false dry run current is recorded.
How is this done?
Can someone share some thought?
Thanks and regards
Comment