making some progress on the canoe
moved it out into the yard as it's been sunny here lately. I was working on the steering linkage but had to get the outrigger mounting structure rigged up to let me finish the steering linkage. That is now done.
You can see a 10 foot length of pvc pipe running a few inches off the right side of the canoe. You are looking at the front of the canoe in the pic. I need a slip connector and another say 4 feet of pipe glued on.
This is all working out very well and when I run into a problem it doesn't take long to figure something out.
fix 60 1.JPG
moved it out into the yard as it's been sunny here lately. I was working on the steering linkage but had to get the outrigger mounting structure rigged up to let me finish the steering linkage. That is now done.
You can see a 10 foot length of pvc pipe running a few inches off the right side of the canoe. You are looking at the front of the canoe in the pic. I need a slip connector and another say 4 feet of pipe glued on.
This is all working out very well and when I run into a problem it doesn't take long to figure something out.
fix 60 1.JPG
Comment