Hi all, I'm thinking about upgrading my 48v battery bank (4 12v AGM 100ah in series) to just one of these PHI 3.8
I need about 1KwH of energy to run stuff at night. My current battery bank can bearly cut it + I'm concerned about
DOD ruining it. The specs say the PHI 3.8 has 3.04KwH @ 80% DOD and 3.8KwH @ 100% DOD. Does that mean I
can only pull out 3.8-3.04 = .76KwH of juice to stay in warranty? Does anyone have experience with this battery?
.................................................. .................................................. .................................................. ......................................
Partially off-grid 48v system. Spartan Automatic transfer switch. 1500w Samlex inverter.
(9) 265w array with 3 (3 panel circuits) to a EPEVER 60amp MPPT charge controller.
I need about 1KwH of energy to run stuff at night. My current battery bank can bearly cut it + I'm concerned about
DOD ruining it. The specs say the PHI 3.8 has 3.04KwH @ 80% DOD and 3.8KwH @ 100% DOD. Does that mean I
can only pull out 3.8-3.04 = .76KwH of juice to stay in warranty? Does anyone have experience with this battery?
.................................................. .................................................. .................................................. ......................................
Partially off-grid 48v system. Spartan Automatic transfer switch. 1500w Samlex inverter.
(9) 265w array with 3 (3 panel circuits) to a EPEVER 60amp MPPT charge controller.
Comment