hi all,,,
having 12v system consist of::: , 2x batteries 12v and 200amh each connected parallel ( means 12v with 400amp output ) charged by.. 1- sun yoba L60 charge controller as 60amp ( its not MPPT but equal to MPPT as written in catalog of the device ), and 3x panels of 200w each. connected parallel also , suppling 600w ( group of lights ), after sunset for about 8hours. all items in system new only 2 weeks ago connected. and having sun 8hours ~ 9hours daily , but I calculated as 7 hours when I build my system to be sure.
the problem is directly after the lights comes on the capacity of the batteries bank drop Significantly from 100% to 85% then keep reducing then Stabilizes at 81% , but after that it goes slowly to 50% for all 8 hours , is it normal or there is something weird .
btw I see the reading in the charger display ,
I am thinking that the charger reading not correct ( I mean either the batteris not fully charged or they are fully charged but the drop not correct ). any comments plz?
having 12v system consist of::: , 2x batteries 12v and 200amh each connected parallel ( means 12v with 400amp output ) charged by.. 1- sun yoba L60 charge controller as 60amp ( its not MPPT but equal to MPPT as written in catalog of the device ), and 3x panels of 200w each. connected parallel also , suppling 600w ( group of lights ), after sunset for about 8hours. all items in system new only 2 weeks ago connected. and having sun 8hours ~ 9hours daily , but I calculated as 7 hours when I build my system to be sure.
the problem is directly after the lights comes on the capacity of the batteries bank drop Significantly from 100% to 85% then keep reducing then Stabilizes at 81% , but after that it goes slowly to 50% for all 8 hours , is it normal or there is something weird .
btw I see the reading in the charger display ,
I am thinking that the charger reading not correct ( I mean either the batteris not fully charged or they are fully charged but the drop not correct ). any comments plz?