Got a complex to me situation as I expand and upgrade our OEM solar setup on our Ford Transit.
I bought the van from a local outfitter and from them it came with a 190w (Go Power GP-PV-190M; 19.1v; 9.3a) panel on top and wired for an external hookup panel which we plug in a 200w suitcase setup when possible. This currently going through a Go Power Solar control to 300ah AMG bank. As I understand it this should be a Parallel setup via a PNW controller.
I will be upgrading next month to 400ah Lithium setup from BattleBorn. With that I am also setting ground work to expand my solar considerably. And it was suggested to replace the Go Power solar controller with a Victron MPPT unit.
My plan is to then add a 2nd matching 190w panel and then two narrow 90w panels on the roof. So total roof would be 2 190w and 2 90w.
The issue I can’t wrap my head around is how to wire this up in series-parallel to retain the external solar hook up for the 200w suitcase setup.
Initial thinking is there are a few possible options:
1) to series the 90-90 together, then parallel that with the 2 190s and the external plug? Or is series-series a possibility?
2) to series the 190-190, 90-90, then parallel those strings with the external plug?
3) to series the 190-90, 190-90, then parallel those strings with the external plug?
Follow up questions would be around the need for in line fuses and combiner box…
Thanks in advance for any help!!
**Edit, I will have both the original Go Power PNW controller and the new Victron MPPT 100/50, so would it be easier to match panel size/brand up top, series those together into the MPPT, then use the OEM Go Power to manage the external plug?
-John
I bought the van from a local outfitter and from them it came with a 190w (Go Power GP-PV-190M; 19.1v; 9.3a) panel on top and wired for an external hookup panel which we plug in a 200w suitcase setup when possible. This currently going through a Go Power Solar control to 300ah AMG bank. As I understand it this should be a Parallel setup via a PNW controller.
I will be upgrading next month to 400ah Lithium setup from BattleBorn. With that I am also setting ground work to expand my solar considerably. And it was suggested to replace the Go Power solar controller with a Victron MPPT unit.
My plan is to then add a 2nd matching 190w panel and then two narrow 90w panels on the roof. So total roof would be 2 190w and 2 90w.
The issue I can’t wrap my head around is how to wire this up in series-parallel to retain the external solar hook up for the 200w suitcase setup.
Initial thinking is there are a few possible options:
1) to series the 90-90 together, then parallel that with the 2 190s and the external plug? Or is series-series a possibility?
2) to series the 190-190, 90-90, then parallel those strings with the external plug?
3) to series the 190-90, 190-90, then parallel those strings with the external plug?
Follow up questions would be around the need for in line fuses and combiner box…
Thanks in advance for any help!!
**Edit, I will have both the original Go Power PNW controller and the new Victron MPPT 100/50, so would it be easier to match panel size/brand up top, series those together into the MPPT, then use the OEM Go Power to manage the external plug?
-John