How much does it cost to add the combiner box (on the roof) to installation. It will definitely help with splicing issue, JB's and conduit cost, and probably lower the total work-hours, I think..
Can't remember, if it's required by NEC to have the CB before going to DC-disconnects (and inverters), I thought that was optional. Correct me if I'm wrong.
Thx
Can't remember, if it's required by NEC to have the CB before going to DC-disconnects (and inverters), I thought that was optional. Correct me if I'm wrong.
Thx